Homebuilding
Warranty Service Order Completion Sign-Off
Homeowner sign-off confirming the work on a warranty service order was performed so the builder can close it in its warranty system, without releasing any claim.
- warranty
- service order
Trade Up to Propper®: get three years of Propper® Sign for one year of what you pay now.
Trade up nowPre-closing orientation and walkthrough record capturing the demonstrated home systems and a punch list of items for the builder to complete. This Homebuilding template is a customizable starting point: preview the sample document below, then fill in your own parties, dates, and terms.
A sample document with example details. Your template opens with fields ready to fill in.
This template is a customizable starting point, not legal advice. Laws vary by state and situation, so have a qualified attorney review any agreement before you rely on it.
!DOCTYPE html
Cedar Crest Homes, LLC
WT-2027-0091
May 3, 2027
Walkthrough #WT-2027-0091
Orientation DateMay 3, 2027
Scheduled ClosingMay 6, 2027
Property123 Juniper Trail, Springvale, CO 80000
Homeowner
Jordan M. Avery and Riley T. Avery
Builder
Cedar Crest Homes, LLC
400 Timberline Parkway, Suite 210, Springvale, CO 80000
This record documents the new-home orientation and pre-closing walkthrough of the home at 123 Juniper Trail, Springvale, CO 80000 (the "Home"), conducted on May 3, 2027 by Casey Moreno of Cedar Crest Homes, LLC with the Homeowner.
During the orientation, the Builder's representative located and demonstrated the operation of the following systems and features:
HVAC thermostat operation and air-filter location
Main water shutoff valve and individual fixture shutoffs
Electrical panel, breaker labeling, and GFCI reset locations
Kitchen appliance operation and owner's manuals
Warranty request process and emergency contact
The Homeowner had the opportunity to ask questions about the operation, maintenance, and warranty coverage of each item above.
The following items were identified during the walkthrough for the Builder to correct or complete:
#
Location
Item to Correct
Target Completion
1
Primary Bedroom
Touch up paint scuff on the north wall near the closet
May 5, 2027
2
Kitchen
Adjust cabinet door alignment to the left of the range
May 5, 2027
3
Garage
Replace weather stripping on the service door
May 21, 2027
The Builder will complete or correct each punch-list item above, at no cost to the Homeowner, by its target completion date or as soon as reasonably practicable after it, and this obligation survives closing. Unless this record states otherwise, open punch-list items do not delay the scheduled closing on May 6, 2027.
By signing below, the Homeowner confirms that the orientation described in Section 1 took place and that the punch-list items above were recorded. This record is not a final acceptance of the Home and does not waive, release, or limit any right or remedy of the Homeowner under the purchase agreement, the limited warranty, or applicable law, including for defects that are not listed above, that were not visible or accessible on the walkthrough date, or that appear later.
The Homeowner and the Builder's representative sign this walkthrough record WT-2027-0091 for 123 Juniper Trail, Springvale, CO 80000.
Homeowner
Jordan M. Avery
Builder Representative
Casey Moreno
Construction Superintendent, Cedar Crest Homes, LLC
Co-Homeowner
Riley T. Avery
Review the sample document and the list of details it captures, so you know what you will fill in.
Choose Use this template and sign up with Google or a 6-digit email code. The trial is on the Business plan, and no credit card is required to start.
The template opens in Propper Gen ready to fill in. Generate your document as a PDF, then send it for eSignature with Propper Sign when you are ready.
More Homebuilding templates you can preview and customize.
Homebuilding
Homeowner sign-off confirming the work on a warranty service order was performed so the builder can close it in its warranty system, without releasing any claim.
Homebuilding
Homeowner acknowledgment of a builder's 1/2/10 limited warranty, summarizing the coverage tiers, exclusions, and the claim-submission process.
Homebuilding
Reserves a specific homesite in a community for a prospective buyer and holds a refundable deposit in escrow through a stated reservation period.
Homebuilding
General-purpose amendment to a new-home purchase agreement, commonly used for buyer name changes, price adjustments, and completion-date revisions, that lists each provision change and preserves all unchanged terms.

Free for 14 days on the Business plan, no credit card required.